-
Hydraulic Oil Seals
-
Hydraulic Cylinder Seal Kit
-
Hydraulic Breaker Seal Kit
-
Center Joint Seal Kit
-
Track Adjuster Seal Kit
-
Control Valve Seal Kit
-
Hydraulic Pump Seal Kit
-
Gear Pump Seal Kit
-
Pilot Valve Seal Kit
-
Swing Motor Seal Kit
-
Travel Motor Seal Kit
-
Transmission Seal Kit
-
O Ring Kit Box
-
Gasket Seals
D51P Gearbox Seal Kit Rubber o ring seal kit 70-90 Shore A
Place of Origin | CHINA(MAINLAND) |
---|---|
Brand Name | SUNCAR |
Certification | ISO9001 |
Model Number | D51P transmission seal kit |
Minimum Order Quantity | Trial order acceptable |
Price | Negotiation |
Packaging Details | PP bag inside, carton box outside |
Delivery Time | 5-7 days after payment received(public holiday excluded) |
Payment Terms | Western Union, L/C, T/T, MoneyGram, D/A, D/P |
Supply Ability | 3000 set per week |

Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xMaterial | PU , Rubber , PTFE , NBR , HNBR | Availability | In Stock |
---|---|---|---|
Place Of Origin | China | Type | Construction Equipment Repair Parts |
Warranty | Unavailable | After-sales Service Provided | Online Support |
Color | As Your Request | Packaging Details | Neutral Packing |
High Light | D51P Gearbox Seal Kit,D51P O Ring Seal Kit,Rubber Gearbox Seal Kit |
D51P Transmission Gearbox Oil Seal Kit Rubber O Ring Sealing Equipment Repair Parts
Product Name | D51P Transmission Gearbox Oil Seal Kit Rubber O Ring Sealing Equipment Repair Parts |
Part No. | D51P |
Material | PU , Rubber , PTFE , NBR , HNBR , ACM , VMQ |
Feature | Resistance to high pressure, oil, weather, abrasion, solvent |
Hardness | 70-90 Shore A |
Color | As your request |
Size | Standard Size |
MOQ | 1 set |
Packing | Neutral packing (As your requirements) |
Delivery Time | 3-5 days after payment received |
Payment | Western Union, L/C, T/T, MoneyGram |
Port | HUAGNPU,China (Mainland) |
Express | Fedex,TNT,UPS,DHL |
Customized | OEM & ODM are welcomed |
Application | Construction equipment repair parts |
Condition | 100% Brand New |
Advantages:
1.Quality. (if you choose our own brand "SUNCAR", the quality absolutely has assurance,for example,our oil seal and seal kit and O-ring 2 weeks warranty, we also can offer the common one.)
2.Price.(our price is neither the highest nor lowest, but I assure that its most reasonable. you can check the quality, you must think our products are deserved, we openly encourage our customers shop around.)
3.Right product you want.(before we confirm the order, we must make sure the produ cts if you want. because we know that if you buy the wrong one, it's just rubbish to you. we must carefully deal with it)
4.MOQ.(From May 1st,2010,we start the rule "no quatity limited",for anthor new customer check our quality,but we haven't raised the price.)
Our Services:
1. Rapid response for your kind enquiry;
2. Reasonable and multiple payment terms;
3. Shortest and fastest delivery time;
4. Cheapest freight charges;
5. Excellent and humanized after-sale services;
6. Samples Purpose Order Accepted
Shipping Suggest:
WEIGHT | RECOMMENDED TRANSPORT MEANS | TRANSPORT TIME | COMMENTS |
<50kg |
express-UPS/DHL/FEDEX door to door service |
3-7 days |
fast convenient expensive |
50-150kg | by air | 3-10 days |
fast; economic; consignee has to do customs clearance |
150>kg | by sea | 10-50 days |
slow; economic; it takes some time for customs clearance and clearance |
FAQ:
1. Are you a trade or a manufacture?
A: We are an industry and trade integration business, our factory located on Guangzhou Foshan
2. How can I be sure the excavator parts will fit my excavator?
A: Give us correct model number/machine serial number/ any numbers on the parts itself Or measure the parts give us dimension or drawing
3. How about the payment terms for bulldozer parts?
A : We usually accept T/T or UC. other terms also could be negotiated
4. What is your delivery time for construction machinery parts?
A : FOB Guangzhou or any Chinese port: 15-20days, if there are any parts in stock our delivery time is only 5-7 days
5. What about Quality Control?
A : We have excellent tester, check every piece to ensure the quality is good, and strict control to ensure product safety into container